Production Line Upgrade/Automotive EPC

Ask Latest Price
Video Channel
Brand Name :CEI-Kinte
Model Number :Customized
Certification :ISO9001/FEM/ISO14001/OHSAS 18001
Place of Origin :China
MOQ :Negotiable
Price :Negotiable
Payment Terms :Negotiable
Supply Ability :Strong production capacity
Delivery Time :According to customer's requirement
Packaging Details :Packed with plastic films and wrap with strips
EPC :Engineering Procurement Construction
Press Shop :Consulting
Body Shop :Main/Closures/Floor/Sub-assembly/Metal finishing
Paint Shop :PT/ED Line/Primer Top Paint
Assembly Shop :Trim/Sub-assembly/Testing
Engineering :Plant Planning, R&D, SE
Production capacity :Improvement
Simulation :PDPS
Overall Planning :General Layout, Analysis Drawings
After-sale Service :24/24 7/7
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Introduction Of New Models

Introduction of new models for welding lines, to realize collinear production of new models and original models

Capacity Improvement

Improvement of line productivity, to convert and upgrade the low-beat lines to high-beat lines

Old Line Relocation

Introduction of new models for welding lines, to realize collinear production of new models and original models

Manual Operation Converted To Automatic Operation

Change manual operation to automatic operation. Transform the manual loading station into automatic loading station. Transform the manual welding station into automatic welding station. Transform the manual gluing station into automatic gluing operation, etc.

Intelligent Transformation

By incorporating MISP industrial big data system, the line beats can be optimized and the failure rate can be lower.

TRANSFORMATION PROCESS

01 Preparation Before Transformation

1. Full demonstration and innovation of process plan

2. Sufficient on-site surveying and mapping, logistics confirmation

3. Detailed construction plan

4. Rigorous project plan

5. Personnel and materials management

6. Standard project management; standard documents, SAP

02 Management During Transformation

1. Mobilization before construction

2. Daily work arrangement and confirmation

3. Safety management

4. Emergency plan

5. Logistics support, customer support, logistics support, customer support

03 Summary After Transformation

1. 24-hour production accompany

2. Quick response to problem points

3. Summary and standardization